The Ask: Humdinger Wind Energy approached us looking for a working proof of concept for their theoretical micro-generator that was powered by the wind.  The concept needed to produced enough power to charge a cell phone or operate a series of LED lights.

My Roles: Lead Industrial Designer

Phases: ME Feasibility, Industrial design

Project Length: ME feasibility, 3 weeks. ID, 2 weeks. 

Challenges: Proving the technology and creating a working prototype that could be set-up and shown in uncertain circumstances.


Prototyping the technology and refining the micro-generator


Renderings and final prototype

 


Featured in Emily Pilloton’s Design Revolution: 100 Products that Empower People

Design Revolution book